In this section:

(1) SING The term “SING” means the Spallation Neutron Source Instruments Next Generation major item of equipment.

(2) SNS power upgrade The term “SNS power upgrade” means the Spallation Neutron Source power upgrade described in the 20-year facilities plan of the Office of Science of the Department.

(3) SNS second target station The term “SNS second target station” means the Spallation Neutron Source second target station described in the 20-year facilities plan of the Office of Science of the Department.

(4) Spallation Neutron Source Facility The terms “Spallation Neutron Source Facility” and “Facility” mean the completed Spallation Neutron Source scientific user facility located at Oak Ridge National Laboratory, Oak Ridge, Tennessee.

(5) Spallation Neutron Source Project The terms “Spallation Neutron Source Project” and “Project” means Department Project 99–E–334, Oak Ridge National Laboratory, Oak Ridge, Tennessee.

The report shall include for the Project—

(1) In general The Secretary shall submit to Congress, as part of the annual budget request of the President submitted to Congress, a report on progress on the Spallation Neutron Source Project.

The report shall include for the Project—

(A) a description of the achievement of milestones;

(B) a comparison of actual costs to estimated costs; and

(C) any changes in estimated Project costs or schedule.

The operational plan shall—

(1) In general The Secretary shall develop an operational plan for the Spallation Neutron Source Facility that ensures that the Facility is employed to the full capability of the Facility in support of the study of advanced materials, nanoscience, and other missions of the Office of Science of the Department.

The operational plan shall—

(A) include a plan for the operation of an effective scientific user program that— (i) is based on peer review of proposals submitted for use of the Facility; (ii) includes scientific and technical support to ensure that external users, including researchers based at institutions of higher education, are able to make full use of a variety of high quality scientific instruments; and (iii) phases in systems upgrades to ensure that the Facility remains at the forefront of international scientific endeavors in the field of the Facility throughout the operating life of the Facility;

(B) include an ongoing program to develop new instruments that builds on the high performance neutron source and that allows neutron scattering techniques to be applied to a growing range of scientific problems and disciplines; and

(C) address the status of and, to the maximum extent practicable, costs and schedules for— (i) full user mode operations of the Facility; (ii) instrumentation built at the Facility during the operating phase through full use of the experimental hall, including the SING; (iii) the SNS power upgrade; and (iv) the SNS second target station.

There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which—

There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which—

(A) $1,192,700,000 shall be used for the costs of construction; and

(B) $219,000,000 shall be used for other Project costs.

Except as provided in subparagraph (B), there is authorized to be appropriated for the Spallation Neutron Source Facility for—

(A) In generalExcept as provided in subparagraph (B), there is authorized to be appropriated for the Spallation Neutron Source Facility for— (i) the SING, $75,000,000 for each of fiscal year 2007 through 2009; and (ii) the SNS power upgrade, $160,000,000, to remain available until expended.

(B) Insufficient stockpiles of heavy water If stockpiles of heavy water of the Department are insufficient to meet the needs of the Facility, there is authorized to be appropriated for the Facility $12,000,000 for fiscal year 2007.

(Pub. L. 109–58, title IX, § 980, Aug. 8, 2005, 119 Stat. 905.)

LegalFix

Copyright ©2024 LegalFix. All rights reserved. LegalFix is not a law firm, is not licensed to practice law, and does not provide legal advice, services, or representation. The information on this website is an overview of the legal plans you can purchase—or that may be provided by your employer as an employee benefit or by your credit union or other membership group as a membership benefit.

LegalFix provides its members with easy access to affordable legal services through a network of independent law firms. LegalFix, its corporate entity, and its officers, directors, employees, agents, and contractors do not provide legal advice, services, or representation—directly or indirectly.

The articles and information on the site are not legal advice and should not be relied upon—they are for information purposes only. You should become a LegalFix member to get legal services from one of our network law firms.

You should not disclose confidential or potentially incriminating information to LegalFix—you should only communicate such information to your network law firm.

The benefits and legal services described in the LegalFix legal plans are not always available in all states or with all plans. See the legal plan Benefit Overview and the more comprehensive legal plan contract during checkout for coverage details in your state.

Use of this website, the purchase of legal plans, and access to the LegalFix networks of law firms are subject to the LegalFix Terms of Service and Privacy Policy.

We have updated our Terms of Service, Privacy Policy, and Disclosures. By continuing to browse this site, you agree to our Terms of Service, Privacy Policy, and Disclosures.
§ 16320. Spallation Neutron Source