49.26.125 Prenotification to department—Exemptions.

WA Rev Code § 49.26.125 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

RCW 49.26.125 Prenotification to department—Exemptions.

Prenotification to the department under RCW 49.26.120 shall not be required for:

(1)(a) Any asbestos project involving less than forty-eight square feet of surface area, or less than ten linear feet of pipe unless the surface area of the pipe is greater than forty-eight square feet. The person undertaking such a project shall keep the reports, or statements, and written descriptions required under RCW 49.26.013 and 49.26.120 which shall be available upon request of the department. Employees and employee representatives may request such reports under RCW 49.26.013(2).

(b) The director may waive the prenotification requirement upon written request of an owner for large-scale, ongoing projects. In granting such a waiver, the director shall require the owner to provide prenotification if significant changes in personnel, methodologies, equipment, work site, or work procedures occur or are likely to occur. The director shall further require annual resubmittal of such notification.

(c) The director, upon review of an owner's reports, work practices, or other data available as a result of inspections, audits, or other authorized activities, may reduce the size threshold for prenotification required by this section. Such a change shall be based on the director's determination that significant problems in personnel, methodologies, equipment, work site, or work procedures are creating the potential for violations of this chapter or asbestos requirements under chapter 49.17 RCW. The new prenotification requirements shall be given in writing to the owner and shall remain in effect until modified or withdrawn in writing by the director.

(2) Emergency projects.

(a) As used in this section, "emergency project" means a project that was not planned and results from a sudden, unexpected event, and does not include operations that are necessitated by nonroutine failure of equipment or systems.

(b) Emergency projects which disturb or release any material containing asbestos into the air shall be reported to the department within three working days after the commencement of the project in the manner otherwise required under this chapter. A notice shall be clearly posted adjacent to the work site describing the nature of the emergency project. The employees' collective bargaining representatives, or employee representatives, or designated representatives, if any, shall be notified of the emergency as soon as possible by the person undertaking the emergency project.

Incremental phasing in the conduct or design of asbestos projects or otherwise designing or conducting asbestos projects of a size less than forty-eight square feet, or other threshold for exemption as provided under this section, with the intent of avoiding prenotification requirements is a violation of this chapter.

[ 1989 c 154 § 8. Prior: 1988 c 271 § 13.]

NOTES:

Purpose—Severability—1989 c 154: See notes following RCW 49.26.013.

LegalFix

Copyright ©2024 LegalFix. All rights reserved. LegalFix is not a law firm, is not licensed to practice law, and does not provide legal advice, services, or representation. The information on this website is an overview of the legal plans you can purchase—or that may be provided by your employer as an employee benefit or by your credit union or other membership group as a membership benefit.

LegalFix provides its members with easy access to affordable legal services through a network of independent law firms. LegalFix, its corporate entity, and its officers, directors, employees, agents, and contractors do not provide legal advice, services, or representation—directly or indirectly.

The articles and information on the site are not legal advice and should not be relied upon—they are for information purposes only. You should become a LegalFix member to get legal services from one of our network law firms.

You should not disclose confidential or potentially incriminating information to LegalFix—you should only communicate such information to your network law firm.

The benefits and legal services described in the LegalFix legal plans are not always available in all states or with all plans. See the legal plan Benefit Overview and the more comprehensive legal plan contract during checkout for coverage details in your state.

Use of this website, the purchase of legal plans, and access to the LegalFix networks of law firms are subject to the LegalFix Terms of Service and Privacy Policy.

We have updated our Terms of Service, Privacy Policy, and Disclosures. By continuing to browse this site, you agree to our Terms of Service, Privacy Policy, and Disclosures.
49.26.125 Prenotification to department—Exemptions.