(a)    Each operator shall comply with the requirements of this section.

(b)    (1)    The operator shall regrade in a manner the Department establishes by rule and regulation and in accordance with the approved reclamation plan. Any regrading shall include, but is not limited to, backfilling, compacting (where necessary to insure stability or prevent leaching of toxic materials), and regrading to restore to the approximate original contour of the affected area with all highwalls, spoil piles, and depressions eliminated, unless depressions are approved by the Department to prevent erosion and retain moisture to assist revegetation.

(2)    All spoil from a permitted area shall be reclaimed within that permitted area or placed on abandoned mine land in a manner approved by the Department. Spoil from a permitted area may not be placed on abandoned mine land if it is needed to achieve the approximate original contour within that permitted area or to meet other permit requirements.

(c)    The operator shall seal off with a material approved by the Department each opening from an underground mining operation at the base of the final cut. The seal shall be constructed in a way to avoid creating danger from impoundment of any large quantity of water.

(d)    If the operator proposes to impound water to provide a lake or pond for wildlife, recreational, or other water supply purposes, he shall file a formal request with the Department and receive approval before the pond or lake is created.

(e)    An operator, with the written approval of the landowner, may propose an alternative plan for reclamation if the land can be used for suitable purposes. The alternate plan shall be submitted to the Department as part of the mining and reclamation plan.

(f)    Unless the operator obtains the prior written approval of the Department, all backfilling described in the approved reclamation plan shall be completed before backfilling equipment is moved from the operation.

(g)    An owner of either surface rights or mineral rights may not interfere with an operator in the discharge of any duties imposed by this subtitle.

LegalFix

Copyright ©2024 LegalFix. All rights reserved. LegalFix is not a law firm, is not licensed to practice law, and does not provide legal advice, services, or representation. The information on this website is an overview of the legal plans you can purchase—or that may be provided by your employer as an employee benefit or by your credit union or other membership group as a membership benefit.

LegalFix provides its members with easy access to affordable legal services through a network of independent law firms. LegalFix, its corporate entity, and its officers, directors, employees, agents, and contractors do not provide legal advice, services, or representation—directly or indirectly.

The articles and information on the site are not legal advice and should not be relied upon—they are for information purposes only. You should become a LegalFix member to get legal services from one of our network law firms.

You should not disclose confidential or potentially incriminating information to LegalFix—you should only communicate such information to your network law firm.

The benefits and legal services described in the LegalFix legal plans are not always available in all states or with all plans. See the legal plan Benefit Overview and the more comprehensive legal plan contract during checkout for coverage details in your state.

Use of this website, the purchase of legal plans, and access to the LegalFix networks of law firms are subject to the LegalFix Terms of Service and Privacy Policy.

We have updated our Terms of Service, Privacy Policy, and Disclosures. By continuing to browse this site, you agree to our Terms of Service, Privacy Policy, and Disclosures.
§ 15-510. Grading; sealing off openings; impounding water; backfilling and planting generally; alternative plans for reclamation; interference with operator