§ 212.50 - What production and process controls must I have?

Copy with citation
Copy as parenthetical citation

You must have adequate production and process controls to ensure the consistent production of a PET drug that meets the applicable standards of identity, strength, quality, and purity.

Written control procedures. You must have written production and process control procedures to ensure and document that all key process parameters are controlled and that any deviations from the procedures are justified.

Master production and control records. You must have master production and control records that document all steps in the PET drug production process. The master production and control records must include the following information:

The name and strength of the PET drug;

If applicable, the name and radioactivity or other measurement of each active pharmaceutical ingredient and each inactive ingredient per batch or per unit of radioactivity or other measurement of the drug product, and a statement of the total radioactivity or other measurement of any dosage unit;

A complete list of components designated by names and codes sufficiently specific to indicate any special quality characteristic;

Identification of all major pieces of equipment used in production;

An accurate statement of the weight or measurement of each component, using the same weight system (metric, avoirdupois, or apothecary) for each component. Reasonable variations are permitted in the amount of component necessary if they are specified in the master production and control records;

A statement of action limits on radiochemical yield, i.e., the minimum percentage of yield beyond which investigation and corrective action are required;

Complete production and control instructions, sampling and testing procedures, specifications, special notations, and precautions to be followed; and

A description of the PET drug product containers, closures, and packaging materials, including a specimen or copy of each label and all other labeling.

Batch production and control records. Each time a batch of a PET drug is produced, a unique batch production and control record must be created. The batch production record must include the following information:

Name and strength of the PET drug;

Identification number or other unique identifier of the specific batch that was produced;

The name and radioactivity or other measure of each active pharmaceutical ingredient and each inactive ingredient per batch or per unit of radioactivity or other measurement of the drug product;

Each major production step (obtained from the approved appropriate master production and control record);

Weights (or other measure of quantity) and identification codes of components;

Dates of production steps and times of critical production steps;

Identification of major pieces of equipment used in production of the batch;

Testing results;

Labeling;

Initials or signatures of persons performing or checking each significant step in the operation; and

Results of any investigations conducted.

Area and equipment checks. The production area and all equipment in the production area must be checked to ensure cleanliness and suitability immediately before use. A record of these checks must be kept.

In-process materials controls. Process controls must include control of in-process materials to ensure that the materials are controlled until required tests or other verification activities have been completed or necessary approvals are received and documented.

Process verification. (1) For a PET drug for which each entire batch undergoes full finished-product testing to ensure that the product meets all specifications, process verification, as described in paragraph (f)(2) of this section, is not required.

When the results of the production of an entire batch of a PET drug are not fully verified through finished-product testing or when only the initial sub-batch in a series is tested, the PET drug producer must demonstrate that the process for producing the PET drug is reproducible and is capable of producing a drug product that meets the predetermined acceptance criteria. Process verification activities and results must be documented. Documentation must include the date and signature of the individual(s) performing the verification, the monitoring and control methods and data, and the major equipment qualified.

LegalFix

Copyright ©2024 LegalFix. All rights reserved. LegalFix is not a law firm, is not licensed to practice law, and does not provide legal advice, services, or representation. The information on this website is an overview of the legal plans you can purchase—or that may be provided by your employer as an employee benefit or by your credit union or other membership group as a membership benefit.

LegalFix provides its members with easy access to affordable legal services through a network of independent law firms. LegalFix, its corporate entity, and its officers, directors, employees, agents, and contractors do not provide legal advice, services, or representation—directly or indirectly.

The articles and information on the site are not legal advice and should not be relied upon—they are for information purposes only. You should become a LegalFix member to get legal services from one of our network law firms.

You should not disclose confidential or potentially incriminating information to LegalFix—you should only communicate such information to your network law firm.

The benefits and legal services described in the LegalFix legal plans are not always available in all states or with all plans. See the legal plan Benefit Overview and the more comprehensive legal plan contract during checkout for coverage details in your state.

Use of this website, the purchase of legal plans, and access to the LegalFix networks of law firms are subject to the LegalFix Terms of Service and Privacy Policy.

We have updated our Terms of Service, Privacy Policy, and Disclosures. By continuing to browse this site, you agree to our Terms of Service, Privacy Policy, and Disclosures.
§ 212.50 - What production and process controls must I have?