LegalFix

§ 171.51 - Maintenance and operations requirements.

Copy with citation
Copy as parenthetical citation

The owner of the facility must establish an adequate maintenance system and provide qualified maintenance personnel to maintain the facility at the level attained at the time it was commissioned. Each person who maintains a facility must meet at least the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance procedures and the use of specialized test equipment.

The owner must prepare, and obtain approval of, an operations and maintenance manual that sets forth mandatory procedures for operations, preventive maintenance, and emergency maintenance, including instructions on each of the following:

Physical security of the facility.

Maintenance and operations by authorized persons only.

FCC licensing requirements for operating and maintenance personnel.

Posting of licenses and signs.

Relation between the facility and FAA air traffic control facilities, with a description of the boundaries of controlled airspace over or near the facility, instructions for relaying air traffic control instructions and information (if applicable), and instructions for the operations of an air traffic advisory service if the facility is located outside of controlled airspace.

Notice to the Administrator of any suspension of service.

Detailed and specific maintenance procedures and servicing guides stating the frequency of servicing.

Air-ground communications, if provided, expressly written or incorporating appropriate sections of FAA manuals by reference.

Keeping of station logs and other technical reports, and the submission of reports required by § 171.53.

Monitoring of the facility.

Inspections by United States personnel.

Names, addresses, and telephone numbers of persons to be notified in an emergency.

Shutdowns for routine maintenance and issue of “Notices to Airmen” for routine or emergency shutdowns (private use facilities may omit the “Notices to Airmen”).

Commissioning of the facility.

An acceptable procedure for amending or revising the manual.

An explanation of the kinds of activities (such as construction or grading) in the vicinity of the facility that may require shutdown or recertification of the facility by FAA flight check.

Procedures for conducting a ground check or localizer course alignment width, and clearance, and glide slope elevation angle and width.

The following information concerning the facility:

Facility component locations with respect to airport layout, instrument runway, and similar areas.

The type, make, and model of the basic radio equipment that will provide the service.

The station power emission and frequencies of the localizer, glide slope, markers, and associated compass locators, if any.

The hours of operation.

Station identification call letters and method of station identification and the time spacing of the identification.

A description of the critical parts that may not be changed, adjusted, or repaired without an FAA flight check to confirm published operations.

The owner shall make a ground check of the facility each month in accordance with procedures approved by the FAA at the time of commissioning, and shall report the results of the checks as provided in § 171.53.

If the owner desires to modify the facility, he must submit the proposal to the FAA and may not allow any modifications to be made without specific approval.

“The owner's maintenance personnel must participate in initial inspections made by the FAA. In the case of subsequent inspections, the owner or his representative shall participate.”

Whenever it is required by the FAA, the owner shall incorporate improvements in ILS maintenance brought about by progress in the state of the art. In addition, he shall provide a stock of spare parts, including vacuum tubes, of such a quantity to make possible the prompt replacement of components that fail or deteriorate in service.

The owner shall provide FAA approved test instruments needed for maintenance of the facility.

The owner shall close the facility upon receiving two successive pilot reports of its malfunctioning.

LegalFix

Copyright ©2024 LegalFix. All rights reserved. LegalFix is not a law firm, is not licensed to practice law, and does not provide legal advice, services, or representation. The information on this website is an overview of the legal plans you can purchase—or that may be provided by your employer as an employee benefit or by your credit union or other membership group as a membership benefit.

LegalFix provides its members with easy access to affordable legal services through a network of independent law firms. LegalFix, its corporate entity, and its officers, directors, employees, agents, and contractors do not provide legal advice, services, or representation—directly or indirectly.

The articles and information on the site are not legal advice and should not be relied upon—they are for information purposes only. You should become a LegalFix member to get legal services from one of our network law firms.

You should not disclose confidential or potentially incriminating information to LegalFix—you should only communicate such information to your network law firm.

The benefits and legal services described in the LegalFix legal plans are not always available in all states or with all plans. See the legal plan Benefit Overview and the more comprehensive legal plan contract during checkout for coverage details in your state.

Use of this website, the purchase of legal plans, and access to the LegalFix networks of law firms are subject to the LegalFix Terms of Service and Privacy Policy.

We have updated our Terms of Service, Privacy Policy, and Disclosures. By continuing to browse this site, you agree to our Terms of Service, Privacy Policy, and Disclosures.
§ 171.51 - Maintenance and operations requirements.